This was a Roadtek job for the Logan Motorways that Allpave Asphalt Services was involved in with supply of our Bitteli BB740 paver, operator and two of our expert Level hands (one for each side of the machine). The bridge was two lanes with a shoulder and measured 13M Total width in the widest section. Allpave’s BB740 Paver was able to complete the task with only three runs leaving just two joins. One down the centre line of the road and the other between the lane and the shoulder. Allpave is prepared to supply as little or as much of the asphalt crew needed to meet your needs.